Industrial Engineering Lab & Simulations
Go beyond theory. Audit authentic vendor equipment datasheets, inspect P&ID safety loops, lead structured HAZOP studies, and diagnose live dynamic plant malfunctions across 16 real-world scenarios.
Equipment Datasheet Audits
Review vendor process datasheets for heat exchangers, pumps, separators, and columns. Catch velocity limits, fouling traps, and design oversights.
P&ID Hazard & Logic Reviews
Inspect piping & instrumentation diagrams, verify control valve fail-safe directions (FO vs FC), emergency depressuring, and shutdown interlocks.
HAZOP Risk Deviation Studies
Lead structured node reviews combining guide words (MORE, LESS, REVERSE) with process parameters to identify causes, consequences, and safeguards.
Dynamic Plant Troubleshooting
Diagnose cavitating pumps, Fin-Fan duty collapse, column flooding, and liquid carryover using live diagnostic test telemetry.
Heat Exchanger Datasheet Audit (E-101 TEMA Class R)
You are conducting a quality control audit on the process datasheet for E-101, a kerosene product cooler operating in an …
Heavy Gas Oil Pump Datasheet Audit (P-102 API 610 12th Ed.)
Review the engineering purchase datasheet for P-102A/B, heavy vacuum gas oil booster pumps servicing a hydrocracker unit. The pump operates …
High-Pressure 3-Phase Separator Audit (V-103 API 12J)
Audit the preliminary mechanical and process datasheet for V-103, an offshore production 3-phase high-pressure test separator. The separator splits crude …
Fractionator Column Tray Hydraulics Audit (C-301 Valve Trays)
Audit the internal hydraulic rating sheet for C-301, a superfractionator column separating propylene from propane with 180 high-efficiency movable valve …
Crude Overhead Receiver P&ID Safety Review (V-102)
Review the Piping & Instrumentation Diagram (P&ID) for V-102, a vertical 3-phase overhead receiver in a crude distillation train. The …
Hydrotreater Reactor Quench & EDP System P&ID (R-101)
Examine the Emergency Depressuring (EDP) and quench valve logic for R-101, an exothermic trickle-bed hydrocracker reactor operating at 145 barg …
Wet Gas Compressor Anti-Surge Loop P&ID (K-201)
Audit the Anti-Surge Protection Loop P&ID for K-201, a multi-stage centrifugal wet gas compressor in an FCCU unit. Evaluate the …
Fired Heater BMS & Fuel Gas Skid P&ID (F-101)
Audit the Burner Management System (BMS) fuel gas piping skid and safety interlock P&ID for F-101, a 25 MW crude …
Amine Absorber HAZOP Deviation Study (C-201)
Lead the HAZOP study on Node 3: Lean amine inlet stream to Column C-201 (High-Pressure Acid Gas Absorber). Sour feed …
Pressurized LPG Storage Sphere HAZOP Study (T-401)
Perform a structured HAZOP node review on T-401, a 2,500 m³ spherical pressure vessel storing liquid propane/butane mix (LPG) at …
Exothermic Semi-Batch Reactor HAZOP (R-201)
Evaluate exothermic runaway risks in R-201, a 15 m³ jacketed semi-batch stirred tank reactor producing acrylic copolymer. Monomer is fed …
Sour Water Stripper Reboiler Thermal Node (D-101)
Analyze the thermal reboiler loop on D-101, a vertical thermosiphon reboiler heating sour water stripper bottoms with 40 bar superheated …
Boiler Feedwater Pump Cavitation Malfunction (P-101A)
Operators report severe cracking noise (resembling gravel being pumped through the casing) and 7.8 mm/s RMS vibration on high-pressure Boiler …
Air-Cooled Heat Exchanger Duty Collapse (E-202 Fin-Fan)
During a summer heatwave, the outlet temperature of heavy naphtha from Fin-Fan Cooler E-202 rose from its 45 °C design …
Deethanizer Column Pressure Spike & Flooding (C-102)
A cryogenic deethanizer column C-102 suddenly experienced an erratic column differential pressure spike from 0.35 bar to 1.15 bar, accompanied …
Fuel Gas KO Drum Liquid Carryover to Gas Turbines (V-205)
Two 40 MW gas turbine power generators tripped on high flame temperature differential and liquid hydrocarbon detector alarms. Investigation reveals …