{}
ChemProCal Academy ChemProCal Academy Academy
🔥 1d Streak
⚡ 0 XP
⚙ + Open Calculator Login Sign Up
Applied Engineering Simulation Workspace

Industrial Engineering Lab & Simulations

Go beyond theory. Audit authentic vendor equipment datasheets, inspect P&ID safety loops, lead structured HAZOP studies, and diagnose live dynamic plant malfunctions across 16 real-world scenarios.

📐

Equipment Datasheet Audits

Review vendor process datasheets for heat exchangers, pumps, separators, and columns. Catch velocity limits, fouling traps, and design oversights.

4 Scenarios (TEMA, API 610, API 12J)
🔍

P&ID Hazard & Logic Reviews

Inspect piping & instrumentation diagrams, verify control valve fail-safe directions (FO vs FC), emergency depressuring, and shutdown interlocks.

4 Scenarios (API 521, NFPA 85, ISA-5.1)
🛡️

HAZOP Risk Deviation Studies

Lead structured node reviews combining guide words (MORE, LESS, REVERSE) with process parameters to identify causes, consequences, and safeguards.

4 Scenarios (IEC 61882, OSHA PSM)
🛠️

Dynamic Plant Troubleshooting

Diagnose cavitating pumps, Fin-Fan duty collapse, column flooding, and liquid carryover using live diagnostic test telemetry.

4 Scenarios (HI 9.6, API 661, FRI)
🔍
⚡
Integrated ChemProCal Engineering Sizers Validate simulation calculations, fluid velocities, and safety margins against rigorous solvers:
DATASHEET AUDIT E-101
+150 XP

Heat Exchanger Datasheet Audit (E-101 TEMA Class R)

Heat Transfer & Exchangers

You are conducting a quality control audit on the process datasheet for E-101, a kerosene product cooler operating in an …

DATASHEET AUDIT P-102A/B
+160 XP

Heavy Gas Oil Pump Datasheet Audit (P-102 API 610 12th Ed.)

Fluid Flow & Piping Hydraulics

Review the engineering purchase datasheet for P-102A/B, heavy vacuum gas oil booster pumps servicing a hydrocracker unit. The pump operates …

DATASHEET AUDIT V-103
+150 XP

High-Pressure 3-Phase Separator Audit (V-103 API 12J)

Separations & Gas Processing

Audit the preliminary mechanical and process datasheet for V-103, an offshore production 3-phase high-pressure test separator. The separator splits crude …

DATASHEET AUDIT C-301
+175 XP

Fractionator Column Tray Hydraulics Audit (C-301 Valve Trays)

Separations & Gas Processing

Audit the internal hydraulic rating sheet for C-301, a superfractionator column separating propylene from propane with 180 high-efficiency movable valve …

P&ID REVIEW V-102
+150 XP

Crude Overhead Receiver P&ID Safety Review (V-102)

Safety Relief & Control Valves

Review the Piping & Instrumentation Diagram (P&ID) for V-102, a vertical 3-phase overhead receiver in a crude distillation train. The …

P&ID REVIEW R-101
+175 XP

Hydrotreater Reactor Quench & EDP System P&ID (R-101)

Process Safety & Loss Prevention

Examine the Emergency Depressuring (EDP) and quench valve logic for R-101, an exothermic trickle-bed hydrocracker reactor operating at 145 barg …

P&ID REVIEW K-201
+165 XP

Wet Gas Compressor Anti-Surge Loop P&ID (K-201)

Fluid Flow & Piping Hydraulics

Audit the Anti-Surge Protection Loop P&ID for K-201, a multi-stage centrifugal wet gas compressor in an FCCU unit. Evaluate the …

P&ID REVIEW F-101
+170 XP

Fired Heater BMS & Fuel Gas Skid P&ID (F-101)

Process Safety & Loss Prevention

Audit the Burner Management System (BMS) fuel gas piping skid and safety interlock P&ID for F-101, a 25 MW crude …

HAZOP STUDY C-201
+150 XP

Amine Absorber HAZOP Deviation Study (C-201)

Separations & Gas Processing

Lead the HAZOP study on Node 3: Lean amine inlet stream to Column C-201 (High-Pressure Acid Gas Absorber). Sour feed …

HAZOP STUDY T-401
+175 XP

Pressurized LPG Storage Sphere HAZOP Study (T-401)

Process Safety & Loss Prevention

Perform a structured HAZOP node review on T-401, a 2,500 m³ spherical pressure vessel storing liquid propane/butane mix (LPG) at …

HAZOP STUDY R-201
+170 XP

Exothermic Semi-Batch Reactor HAZOP (R-201)

Chemical Reaction Engineering (CRE)

Evaluate exothermic runaway risks in R-201, a 15 m³ jacketed semi-batch stirred tank reactor producing acrylic copolymer. Monomer is fed …

HAZOP STUDY D-101
+165 XP

Sour Water Stripper Reboiler Thermal Node (D-101)

Heat Transfer & Exchangers

Analyze the thermal reboiler loop on D-101, a vertical thermosiphon reboiler heating sour water stripper bottoms with 40 bar superheated …

TROUBLESHOOTING P-101A
+150 XP

Boiler Feedwater Pump Cavitation Malfunction (P-101A)

Fluid Flow & Piping Hydraulics

Operators report severe cracking noise (resembling gravel being pumped through the casing) and 7.8 mm/s RMS vibration on high-pressure Boiler …

TROUBLESHOOTING E-202
+150 XP

Air-Cooled Heat Exchanger Duty Collapse (E-202 Fin-Fan)

Heat Transfer & Exchangers

During a summer heatwave, the outlet temperature of heavy naphtha from Fin-Fan Cooler E-202 rose from its 45 °C design …

TROUBLESHOOTING C-102
+170 XP

Deethanizer Column Pressure Spike & Flooding (C-102)

Separations & Gas Processing

A cryogenic deethanizer column C-102 suddenly experienced an erratic column differential pressure spike from 0.35 bar to 1.15 bar, accompanied …

TROUBLESHOOTING V-205
+165 XP

Fuel Gas KO Drum Liquid Carryover to Gas Turbines (V-205)

Separations & Gas Processing

Two 40 MW gas turbine power generators tripped on high flame temperature differential and liquid hydrocarbon detector alarms. Investigation reveals …