{}
ChemProCal Academy ChemProCal Academy Academy
🔥 1d Streak
⚡ 0 XP
⚙ + Open Calculator Login Sign Up
← Back to Industrial Engineering Lab
📐 DATASHEET AUDIT TAG: E-101 📜 TEMA Class R / API 660

Heat Exchanger Datasheet Audit (E-101 TEMA Class R)

Interactive Industrial Simulation • Standards Verification • Reward: +150 XP

Reward
+150 XP
📐

Interactive Process & Instrumentation Schematic

ISA-5.1 Vector Standard
Kerosene In (115°C) Kerosene Out (40°C) CW In (32°C) CW Out (42°C) E-101 (TEMA BEM) ! !
💡 Inspect nozzle configurations, flow directions, instruments, and discrepancy flags marked with !

1. Industrial Operating Briefing

Context & Boundaries

You are conducting a quality control audit on the process datasheet for E-101, a kerosene product cooler operating in an oil refinery hydrotreater unit. The vendor has submitted a TEMA Type BEM (fixed tubesheet) exchanger specification. You must verify shell and tube velocities, cooling water fouling allowances, metallurgy, and baffle cut geometries against API 660 and TEMA standards to prevent premature tube rupture and biofouling sedimentation.

2. Equipment Process Datasheet

Specifications Under Review
Equipment Tag E-101
Tube Side Fluid Hydrotreated Kerosene Product
Shell Side Fluid Treated Cooling Water (CW)
Baffle Type & Cut Single Segmental / 45% Diameter Cut
TEMA Configuration BEM (Fixed Tubesheet, 1 Shell Pass, 2 Tube Passes)
Corrosion Allowance Shell: 1.5 mm / Tube: 0.0 mm
Cooling Water Velocity 0.58 m/s (Reported in Shell)
Kerosene Tube Velocity 1.45 m/s
Tube Inlet / Outlet Temp 115.0 °C / 40.0 °C
Shell Inlet / Outlet Temp 32.0 °C / 42.0 °C
Tube Material / Dimensions Carbon Steel (CS A-179) / 19.05 mm OD x 2.11 mm wall (14 BWG)
Tube Operating / Design Pressure 14.5 barg / 21.0 barg
Fouling Resistance (Shell / Tube) 0.00018 m²·K/W / 0.00035 m²·K/W
Shell Operating / Design Pressure 3.5 barg / 6.0 barg
⚡ Verify in ChemProCal Live Tool

Open the dedicated engineering calculator to independently verify velocities, duties, and hydraulic limits.

Open Double-Pipe & Hairpin Heat Exchanger Sizer ↗

3. Datasheet Audit Findings Checklist

Simulation Active

Audit the process datasheet against design standards. Check all discrepancies and design oversights you have identified: