{}
ChemProCal Academy ChemProCal Academy Academy
🔥 1d Streak
⚡ 0 XP
⚙ + Open Calculator Login Sign Up
← Back to Industrial Engineering Lab
🛠️ DYNAMIC TROUBLESHOOTING TAG: V-205 📜 API 521 / API 14J / ISO 23251

Fuel Gas KO Drum Liquid Carryover to Gas Turbines (V-205)

Interactive Industrial Simulation • Standards Verification • Reward: +165 XP

Reward
+165 XP
📐

Interactive Process & Instrumentation Schematic

ISA-5.1 Vector Standard
V-205 Level Above Demister! Raw Condensate to Turbines ⚠ LCV-205 Stuck (5%)
💡 Inspect nozzle configurations, flow directions, instruments, and discrepancy flags marked with !

1. Industrial Operating Briefing

Context & Boundaries

Two 40 MW gas turbine power generators tripped on high flame temperature differential and liquid hydrocarbon detector alarms. Investigation reveals heavy raw hydrocarbon condensate carryover from Fuel Gas Knockout Drum V-205 into the fuel supply manifold. Audit the demister pad condition, automated drain valve, and gas face velocity to isolate the root cause.

2. Equipment Process Datasheet

Specifications Under Review
Vessel Tag V-205 (Fuel Gas Knockout Drum with Wire Mesh Demister)
Demister Pad Stainless Steel Mesh (150 mm thick)
Liquid Removal Automated Dump Valve LCV-205 on Level Control
Normal Gas Flow 18 MMSCFD at 22 barg

🛠️ Interactive Diagnostic Action Console

Live Telemetry Actions

Select diagnostic procedures below to gather real-time telemetry, vibration spectra, and gauge readings:

Local Physical Inspection of LCV-205 Drain Valve
Measure Demister Pad Differential Pressure

Live Operating Telemetry & Fault Symptoms

Field Symptoms
Gas Flow Surge Gas flow surged to 28 MMSCFD during refinery upset
High Level Alarm LSHH-205 Did not trip due to failed float switch ball stuck with heavy wax deposit
Liquid Dump Valve LCV-205 Position indicator shows 100% open, but actual actuator stem is stuck mechanically at 5% open
⚡ Verify in ChemProCal Live Tool

Open the dedicated engineering calculator to independently verify velocities, duties, and hydraulic limits.

Open KO Drum Sizing ↗

3. Root Cause & Remediation Checklist

Simulation Active

Correlate the diagnostic telemetry with failure modes. Select all contributing causes and required corrective actions: