ChemProCal Academy ChemProCal Academy Academy
🔥 1d Streak
⚡ 0 XP
⚙ + Open Calculator Login Sign Up
Learn / Material & Energy Balances / Material Balances on Non-Reactive Systems
Material Balances on Non-Reactive Systems 1 Practice Questions ⚡ Live Calculator Connected

Unsteady-State Non-Reactive Material Balances (Tank Draining & Filling)

Covers transient unsteady-state material balances on non-reactive systems, formulating ordinary differential equation (ODE) mass balances, Torricelli tank drainage, batch dilution, and purge dynamics.

⚡ Open Live Tool Practice Questions ↓

1. Theoretical Foundations & Engineering Mechanics

Unsteady-State Accumulation

When mass flows in and out of a process vessel are unbalanced, or when inlet stream concentrations fluctuate with time, the accumulation term in the conservation equation cannot be neglected:

$$\frac{dM_{total}}{dt} = \sum_{in} \dot{m}_{in}(t) - \sum_{out} \dot{m}_{out}(t)$$
$$\frac{d(M x_i)}{dt} = \sum_{in} (w_i \dot{m})_{in} - \sum_{out} (w_i \dot{m})_{out}$$

Expanding the derivative of the product $M x_i$ via the chain rule:

$$\frac{d(M x_i)}{dt} = M \frac{dx_i}{dt} + x_i \frac{dM}{dt}$$

Two Canonical Industrial Archetypes

  1. Constant Volume Tank with Variable Concentration (Stirred Flush / Dilution):
    If inflow equals outflow ($Q_{in} = Q_{out} = Q$), liquid volume $V$ is constant ($dM/dt = 0$):
    $$V \frac{dC}{dt} = Q C_{in} - Q C \implies \tau \frac{dC}{dt} + C = C_{in}, \quad \tau = \frac{V}{Q}$$
    Solving for a step from initial concentration $C_0$ to pure flush water ($C_{in} = 0$):
    $$C(t) = C_0 e^{-t/\tau}$$
  2. Gravity Tank Drainage (Torricelli's Law):
    Discharge flow rate varies with instantaneous liquid level $h(t)$:
    $$Q_{out}(t) = C_d A_{orifice} \sqrt{2 g h(t)}$$
    $$A_{tank} \frac{dh}{dt} = -C_d A_{orifice} \sqrt{2 g h(t)}$$
    Separating variables and integrating yields the total drain time.

2. Governing Equations & Mathematical Formulation

$$\frac{dM}{dt} = \dot{m}_{in} - \dot{m}_{out}$$
$$\frac{d(V C)}{dt} = Q_{in} C_{in} - Q_{out} C_{out}$$
$$C(t) = C_{in} + (C_0 - C_{in}) e^{-t/\tau}$$
$$t_{drain} = \frac{2 A_{tank}}{C_d A_o \sqrt{2g}} \left( \sqrt{h_0} - \sqrt{h_f} \right)$$

💡 Formulated according to international process engineering standards and dimensionless groups.
📌 Key Engineering Assumptions

• Fluid density is constant ($1000\text{ kg/m}^3$).
• Liquid volume remains exactly constant at $8.0\text{ m}^3$.
• Complete backmixing without stagnant dead zones.
• Fresh water feed contains zero salt.

⚠️ Common Industrial Pitfalls

• Forgetting exponential decay formula.
• Confusing flushing percentage ($99\%$) with remaining fraction ($1\%$).
• Dividing volume by tank area instead of volumetric flow rate when computing time constant.

3. Applied Engineering Worked Example

Design Problem Specification

Standard process engineering operating and design conditions.

Step-by-Step Mathematical Derivation & Verification

Step-by-Step Analytical Solution:

  1. Governing differential equation:
    $$V \frac{dC}{dt} = Q_{in} C_{in} - Q_{out} C(t)$$
    Since $C_{in} = 0$ and $Q_{in} = Q_{out} = Q$:
    $$V \frac{dC}{dt} = -Q C(t) \implies \frac{dC}{dt} + \frac{Q}{V} C(t) = 0$$
    $$\frac{dC}{C} = -\frac{Q}{V} dt$$
    Integrating from $C_0$ to $C(t)$:
    $$C(t) = C_0 e^{-(Q/V) t} = C_0 e^{-t/\tau}$$

  2. Time constant $\tau$:
    $$\tau = \frac{V}{Q} = \frac{8.00\text{ m}^3}{0.40\text{ m}^3/\text{min}} = \mathbf{20.00\text{ min}}$$

  3. Concentration at $t = 30.0\text{ min}$:
    $$C(30.0) = 50.0 \times e^{-30.0 / 20.0} = 50.0 \times e^{-1.50} = 50.0 \times 0.22313 = \mathbf{11.16\text{ kg/m}^3}$$

  4. Time to remove 99.0% of salt:
    To remove $99.0\%$, the remaining concentration is $1.0\%$ of $C_0$:
    $$C(t) = (0.010)(50.0) = 0.50\text{ kg/m}^3$$
    $$0.010 = e^{-t / 20.0} \implies -\frac{t}{20.0} = \ln(0.010) = -4.60517$$
    $$t = 20.00 \times 4.60517 = \mathbf{92.10\text{ min}}$$
    Flushing $99\%$ of inventory requires $4.6$ residence times ($92.1\text{ min}$).

Interactive Practice Drill: Unsteady-State Non-Reactive Material Balances (Tank Draining & Filling)

Instant answer checking, step rationales, and tolerance scoring.
Question 1 of 1
Loading interactive questions...

Completed this lesson?

Record your study progress, build your daily streak, and unlock +25 XP toward your next engineering tier.

⚡

Connected ChemProCal Tool

Run numerical simulations with real physical property packages.
Flash Drum Sizing

Thermodynamic flash calculation and drum sizing.

Verified Equations Engineering Tolerances
Launch Live Tool ⚡