Kremser Equation & Absorption/Stripping Factor

Kremser-Brown-Souders analytical equations for stage-wise absorption and stripping, the Absorption Factor (A), and recovery efficiency charts.

⚡ Open Live Tool Practice Questions ↓

1. Theoretical Foundations & Engineering Mechanics

Kremser Equation & Absorption/Stripping Factor

When operating lines and equilibrium curves are linear ($y^* = m x$), the number of theoretical equilibrium stages can be determined analytically without graphical stage stepping using the Kremser-Brown-Souders equations.

1. The Absorption Factor ($A$)

The absorption factor $A$ is the ratio of the operating line slope ($L/V$) to the equilibrium line slope ($m$):
$$A = \frac{L}{m V}$$
where:
- $L$ is molar liquid solvent rate ($\text{kmol/h}$)
- $V$ is molar gas rate ($\text{kmol/h}$)
- $m$ is the slope of the equilibrium line ($y^* = m x$)
- When $A > 1.0$: Solvent capacity exceeds gas solute flow. High recovery ($>99\%$) is achievable with reasonable stage counts. Standard industrial design uses $A = 1.25 - 1.50$.
- When $A < 1.0$: Gas rate overwhelms solvent capacity. Complete absorption is thermodynamically impossible even with infinite stages ($N \rightarrow \infty$, recovery caps at $A$).

2. The Stripping Factor ($S$)

For desorption/stripping columns where solute transfers from liquid to gas, the stripping factor is the exact inverse of $A$:
$$S = \frac{1}{A} = \frac{m V}{L}$$
Standard stripping columns operate at $S = 1.25 - 1.50$.

2. Governing Equations & Mathematical Formulation

$$A = \frac{L}{m V} \quad [\text{Absorption Factor}]$$

$$N = \frac{\ln\left[ \left( \frac{y_{in} - m x_{in}}{y_{out} - m x_{in}} \right) \left(1 - \frac{1}{A}\right) + \frac{1}{A} \right]}{\ln A} \quad [A \neq 1]$$

$$N = \frac{y_{in} - y_{out}}{y_{out} - m x_{in}} \quad [\text{For } A = 1.0]$$

$$\frac{y_{in} - y_{out}}{y_{in} - m x_{in}} = \frac{A^{N+1} - A}{A^{N+1} - 1} \quad [\text{Fraction Absorbed}]$$

💡 Formulated according to international process engineering standards and dimensionless groups.
📌 Key Engineering Assumptions

• Dilute solute concentration in both gas and liquid streams ($< 5\text{ mol}\%$).
• Constant molar flow rates ($L$ and $V$ do not change significantly along the column).
• Linear equilibrium line passing through or near origin ($y^* = m x$).
• Isothermal operation.

⚠️ Common Industrial Pitfalls

• Operating an absorber at $A < 1.0$ expecting to achieve high recovery by simply adding more trays/packing; $A < 1$ creates an immediate thermodynamic pinch.
• Using total gas flow instead of inert carrier flow when solute concentrations are high ($> 10\%$).
• Ignoring temperature rise in the liquid phase which increases $m$, causing local $A$ to plummet midway down the column.
• Confusing pure solvent feed ($x_{in} = 0$) with recycled lean solvent having residual solute loading.

3. Applied Engineering Worked Example

Design Problem Specification

Standard industrial operating and sizing conditions.

Step-by-Step Mathematical Derivation & Verification

Problem Statement:
An absorber treats $V = 500\text{ kmol/h}$ of gas containing $3.0\text{ mol}\%$ acetone ($y_{in} = 0.030$) to reduce it to $0.15\text{ mol}\%$ ($y_{out} = 0.0015$, $95\%$ recovery). Pure water ($x_{in} = 0$) enters at rate $L = 1200\text{ kmol/h}$. The equilibrium relationship is $y^* = 1.75 x$. Calculate the absorption factor $A$ and the required number of theoretical stages $N$.

Step-by-step Solution:
1. Calculate absorption factor $A$:
$$A = \frac{L}{m V} = \frac{1200\text{ kmol/h}}{1.75 \times 500\text{ kmol/h}} = \frac{1200}{875} = \mathbf{1.3714}$$
Since $A = 1.3714 > 1.0$, the column operates in the favorable absorption regime.

  1. Formulate Kremser argument (pure solvent, $x_{in} = 0$):
    $$\frac{y_{in} - m x_{in}}{y_{out} - m x_{in}} = \frac{0.030}{0.0015} = 20.0$$
    $$1 - \frac{1}{A} = 1 - \frac{1}{1.3714} = 1 - 0.72917 = 0.27083$$
    $$\text{Argument} = (20.0 \times 0.27083) + 0.72917 = 5.4166 + 0.72917 = 6.1458$$

  2. Compute required theoretical stages $N$:
    $$N = \frac{\ln(6.1458)}{\ln(1.3714)} = \frac{1.81577}{0.31583} = \mathbf{5.75\text{ stages}}$$
    (Specifying 6 theoretical equilibrium stages).

Interactive Practice Drill: Kremser Equation & Absorption/Stripping Factor

Instant answer checking, step rationales, and tolerance scoring.
Question 1 of 15
Loading interactive questions...

Completed this lesson?

Record your study progress, build your daily streak, and unlock +25 XP toward your next engineering tier.

⚡

Connected ChemProCal Tool

Run numerical simulations with real physical property packages.