Adsorption Isotherms & Breakthrough Curves
Fixed-bed adsorption, Langmuir, Freundlich, and BET isotherms, Mass Transfer Zone (MTZ), breakthrough curves, and dynamic bed capacity.
1. Theoretical Foundations & Engineering Mechanics
Adsorption Isotherms & Breakthrough Curves
Adsorption is the selective accumulation of fluid solute molecules (adsorbate) onto the porous internal surfaces of a solid adsorbent (molecular sieves, activated carbon, silica gel, activated alumina).
1. Equilibrium Adsorption Isotherms
- Langmuir Isotherm (Monolayer, Energetically Uniform):
$$q = \frac{q_m K C}{1 + K C}$$
where $q_m$ is maximum monolayer capacity ($\text{mg/g}$ or $\text{mol/kg}$) and $K$ is affinity constant. - Freundlich Isotherm (Multilayer, Heterogeneous Surface):
$$q = K_F C^{1/n} \quad (n > 1 \implies \text{favorable adsorption})$$ - Brunauer-Emmett-Teller (BET) Isotherm: Models multilayer gas adsorption used universally to measure catalyst/adsorbent specific surface area ($A_{BET}$).
2. Fixed-Bed Dynamics & Breakthrough Curves
In a continuous fixed-bed adsorber, adsorption occurs in an S-shaped Mass Transfer Zone (MTZ) that travels downstream through the bed:
- Upstream of MTZ: Bed is completely saturated/exhausted ($C = C_0, q = q_0$).
- Downstream of MTZ: Bed is fresh/virgin ($C \approx 0, q \approx 0$).
- Breakthrough Point ($t_b$): The time when exit concentration reaches the maximum permissible limit (typically $C/C_0 = 0.05$).
- Exhaustion Point ($t_e$): The time when exit concentration reaches $C/C_0 = 0.95$.
- Length of Unused Bed (LUB):
$$\text{LUB} = L_{bed} \left( 1 - \frac{t_b}{t^*} \right)$$
where $t^*$ is the stoichiometric stoichiometric center time of the breakthrough curve.
2. Governing Equations & Mathematical Formulation
$$q = \frac{q_m K C}{1 + K C} \quad [\text{Langmuir Isotherm}]$$
$$q = K_F C^{1/n} \quad [\text{Freundlich Isotherm}]$$
$$\text{LUB} = L_{bed} \left( 1 - \frac{t_b}{t^*} \right) \quad [\text{Length of Unused Bed}]$$
$$t^* = \int_0^\infty \left(1 - \frac{C}{C_0}\right) dt$$
$$W_{adsorbent} = \frac{\dot{m}_{gas} y_{in} t_b}{q_{dynamic}}$$
• Isothermal adsorption bed.
• Plug flow with negligible axial dispersion.
• Symmetric or constant-pattern S-shaped breakthrough curve.
• Negligible pressure drop during clean adsorption cycle.
• Sizing an industrial adsorber using static equilibrium capacity ($q_m$) instead of dynamic breakthrough capacity ($q_b$); dynamic capacity is $30 - 50\%$ lower due to the MTZ.
• Ignoring competitive co-adsorption (e.g. heavy hydrocarbons displacing water on molecular sieves, causing sudden premature water breakthrough).
• Operating beds past breakthrough ($t > t_b$), which contaminates downstream cryogenic equipment with freezing hydrates.
• Neglecting bed voidage when computing superficial gas velocities.
3. Applied Engineering Worked Example
Standard industrial operating and sizing conditions.
Problem Statement:
A packed adsorption bed of length $L = 3.0\text{ m}$ dehydrates natural gas. A breakthrough test at design velocity reveals:
- Breakthrough time ($C/C_0 = 0.05$): $t_b = 14.0\text{ hours}$
- Stoichiometric saturation time ($C/C_0 = 0.50$): $t^* = 17.5\text{ hours}$
Calculate the Length of Unused Bed (LUB), the fractional bed utilization at breakthrough, and the total bed length required if the operating cycle must be extended to $t_b = 24.0\text{ hours}$ without changing the MTZ thickness.
Step-by-step Solution:
1. Calculate Length of Unused Bed (LUB):
$$\text{LUB} = L \left( 1 - \frac{t_b}{t^*} \right) = 3.0\text{ m} \times \left( 1 - \frac{14.0}{17.5} \right) = 3.0 \times (1 - 0.80) = \mathbf{0.60\text{ m}}$$
-
Calculate Fractional Bed Utilization at breakthrough:
$$\text{Fraction Used} = \frac{t_b}{t^*} = \frac{14.0}{17.5} = 0.80 = \mathbf{80.0\%}$$
(20% of the bed length is wasted as MTZ at breakthrough). -
Calculate required bed length for $t_b = 24.0\text{ hours}$:
The MTZ length (LUB) remains constant at $0.60\text{ m}$.
- Saturated bed length needed for 14 hours was $L_{sat} = 3.0 - 0.60 = 2.40\text{ m}$.
- For 24 hours: $L_{sat,new} = 2.40 \times \left( \frac{24.0}{14.0} \right) = 2.40 \times 1.7143 = 4.114\text{ m}$.
- Total length required:
$$L_{total,new} = L_{sat,new} + \text{LUB} = 4.114 + 0.60 = \mathbf{4.714\text{ m}}$$
Interactive Practice Drill: Adsorption Isotherms & Breakthrough Curves
Completed this lesson?
Record your study progress, build your daily streak, and unlock +25 XP toward your next engineering tier.