Three-Phase Oil/Water/Gas Separation & Coalescing Weirs
Three-phase (oil/water/gas) separator design, water boot sizing, coalescing plate packs, weir height calculations, and Stokes settling velocity of water droplets in crude oil.
1. Theoretical Foundations & Engineering Mechanics
Three-Phase Oil/Water/Gas Separation & Coalescing Weirs
Three-phase separators process multiphase wellstreams, simultaneously separating gas, light hydrocarbon liquid (crude oil/condensate), and dense aqueous liquid (produced water/brine).
1. Gravity Settling of Immiscible Liquids (Stokes’ Law)
Liquid-liquid separation relies on the density differential between oil ($\rho_o \approx 800 - 880\text{ kg/m}^3$) and water ($\rho_w \approx 1020 - 1100\text{ kg/m}^3$).
Settling of water droplets in the continuous oil phase follows Stokes’ law:
$$u_t = \frac{g d_p^2 (\rho_w - \rho_o)}{18 \mu_o}$$
where $\mu_o$ is the continuous oil phase dynamic viscosity. Heavy, viscous crudes dramatically reduce settling velocity, requiring heating or coalescers.
2. Internal Level & Weir Control Schemes
- Weir with Water Boot: Suitable for low water cuts ($< 10 - 15\%\text{ water}$). Oil overflows a full weir into an oil compartment, while water settles into a narrow vertical cylindrical boot at the bottom of the drum for interface control.
- Dual Weir (Bucket and Weir): Suitable for high water cuts ($> 20\%$). Oil spills over an oil weir; water discharges via an underflow baffle.
- Plate Coalescers: Corrugated tilted plate packs (CPI) reduce settling distance from several feet to $10 - 20\text{ mm}$, promoting droplet agglomeration.
2. Governing Equations & Mathematical Formulation
$$u_{t,water\_in\_oil} = \frac{g d_p^2 (\rho_w - \rho_o)}{18 \mu_o}$$
$$u_{t,oil\_in\_water} = \frac{g d_p^2 (\rho_w - \rho_o)}{18 \mu_w}$$
$$h_{weir} = h_{total} - h_{vapor\_space}$$
$$t_{retention,oil} = \frac{V_{oil}}{Q_{oil}} \ge 5 - 15\text{ min}, \quad t_{retention,water} \ge 5 - 10\text{ min}$$
• Immiscible liquid phases with clean interface (no persistent rag-layer emulsion).
• Water droplet size target: settle droplets down to $150 - 200\text{ \mu m}$ from oil phase to meet $< 0.5\% - 1.0\%$ Basic Sediment and Water (BS&W) export specs.
• Oil droplet size target: rise droplets $> 200\text{ \mu m}$ from water phase to meet environmental discharge limits.
• Neglecting crude oil emulsion formation: without demulsifier chemical injection, oil and water form a thick emulsion pad that overflows into both outlets.
• Sizing water boots too narrow ($D_{boot} < 18\text{ in}$), creating high downward water velocities ($> 15\text{ mm/s}$) that drag oil droplets down the water drain.
• Ignoring density changes with temperature: cold operating temperatures drastically increase oil viscosity and arrest settling.
3. Applied Engineering Worked Example
Crude Oil Flow: $Q_o = 45\text{ m}^3\text{/h} = 0.0125\text{ m}^3\text{/s}$, $\rho_o = 840\text{ kg/m}^3$, $\mu_o = 8.5\text{ cP} = 0.0085\text{ Pa}\cdot\text{s}$
Produced Water Flow: $Q_w = 20\text{ m}^3\text{/h}$, $\rho_w = 1040\text{ kg/m}^3$
Target Droplet Cutoff: Separate $200\text{ \mu m}$ ($2.0 \times 10^{-4}\text{ m}$) water droplets from oil
Vessel Geometry: Horizontal separator, oil pad thickness $h_o = 0.60\text{ m}$
-
Compute Water Droplet Terminal Settling Velocity via Stokes’ Law:
$$u_t = \frac{9.81 \times (2.0 \times 10^{-4})^2 \times (1040 - 840)}{18 \times 0.0085} = \frac{9.81 \times 4.0 \times 10^{-8} \times 200}{0.153} = \frac{7.848 \times 10^{-5}}{0.153} = 5.129 \times 10^{-4}\text{ m/s}$$
In mm/s: $u_t = 0.513\text{ mm/s}$. -
Calculate Required Oil Residence Time ($t_{res}$):
Time required for a droplet to fall across the full $0.60\text{ m}$ oil pad:
$$t_{settle} = \frac{h_o}{u_t} = \frac{0.60\text{ m}}{5.129 \times 10^{-4}\text{ m/s}} = 1,170\text{ seconds} = 19.5\text{ minutes}$$ -
Calculate Required Oil Volume in Settling Zone:
$$V_{oil} = Q_o \times t_{settle} = 0.0125\text{ m}^3/\text{s} \times 1,170\text{ s} = 14.62\text{ m}^3$$ -
Conclusion:
To achieve clean oil with $< 0.5\%$ water, the separator oil settling compartment must provide at least $14.6\text{ m}^3$ active volume ($19.5\text{ minutes}$ residence time).
Interactive Practice Drill: Three-Phase Oil/Water/Gas Separation & Coalescing Weirs
Completed this lesson?
Record your study progress, build your daily streak, and unlock +25 XP toward your next engineering tier.
Connected ChemProCal Tool
Rigorous 2-phase sizing for horizontal separation vessels.