← Back to Game Arena
GAME 06 • ENGINEERING PUZZLES
🔄 Process Flow Puzzle
Construct thermodynamically valid process flow diagrams (PFDs). Sequence separation, reaction, and compression stages correctly!
⏱️ 00:00
Offshore Natural Gas Sweetening & Dehydration Train
Crude Oil Atmospheric Distillation & Stabilization
Produced Water De-Oiling & Deep Injection Train
Closed-Loop Propane Refrigeration Subcooling Cycle
Offshore & Environmental • Intermediate
Slots Needed: 5
Produced Water De-Oiling & Deep Injection Train
Arrange the water treatment units in order of progressively tighter separation to meet environmental discharge or reservoir injection specs.
🏭 Flowsheet Sequence (Inlet → Export)
📦 Available Process Equipment
Click an equipment card below to place it into the next available slot. Beware of redundant distractor units!
Academy Sections
Jump directly to any engineering module