Engineering Puzzle Suite • Game 12

🔧 Piping Maze & Valve Lineup Challenge

Trace complex process flowlines, avoid deadheads and thermal shock, and execute correct Double Block and Bleed (DBB) isolation sequences.

⏱️ 02:30 ⚡ +65 XP
🔧 Ethylene Splitter Reboiler Maintenance Isolation 🔧 Centrifugal Pump Startup & Recycle Lineup
Step 1 of 3 Ethylene Splitter Reboiler Maintenance Isolation

📐 Process Flowline & Valve Map (P&ID)
💡 Hover or tap choices to highlight matching valve tags on schematic
P&ID SCHEMATIC: ETHYLENE SPLITTER C-201 PARALLEL REBOILER SYSTEM TAG: E-201A / B ETHYLENE TOWER C-201 Liquid Pool 8"-HC-2011 BRANCH A (IN SERVICE) XV XV-2011 PCV-2012 BDV-201A REBOILER E-201A ● IN SERVICE PSV-2013 FO-2014 VAPOR RETURN BRANCH B (COLD STANDBY) XV-2021 (SHUT) 2" WARM-UP BYPASS LINE XV-2020 REBOILER E-201B ○ COLD STANDBY