Process Safety & Loss Prevention Specialist
Focused on HAZOP chairing, LOPA risk assessment, SIL determination, API 520/521 overpressure protection, and emergency flare network engineering.
Milestone Module 1
1. Overpressure Analysis & API 520/521 PSV Sizing
Identify controlling relief scenarios: fire case, blocked discharge, control valve failure, and tube rupture.
⚡ Rapid-Fire Interview Questions & Model Answers (15)
Click to toggle answer
Q1: Briefly explain the working principle of a Pressure Safety Valve (PSV). How does it achieve snap "pop" action for vapor service versus proportional lift for liquid service?
Q2: What are all the credible scenarios that can overpressurize protected equipment during process design? How do you apply the API 521 single-jeopardy principle?
Q3: What are the relieving cases applicable for an Instrument Air Receiver? Explain how you determine the governing relief load.
Q4: How do you calculate the heat input and relief load for PRV sizing under an external pool fire exposure scenario per API 521?
Q5: In PRV fire case sizing for a wetted vessel containing multi-component hydrocarbons (e.g. methane, propane, heptane), which latent heat of vaporization do you use?
Q6: What is the inlet line sizing criteria for a PSV? Why does API 520 enforce the 3% pressure drop rule?
Q7: If the calculated inlet pressure drop for a PSV exceeds 3% of set pressure, what engineering solutions and mitigation strategies do you suggest?
Q8: What is the criteria for PSV outlet line and header sizing? What are the Mach number limits for individual tailpipes versus main flare headers?
Q9: Suppose your PSV sizing calculation shows a "D" orifice is sufficient, but the client insists on providing an "E" orifice. What is your technical advice and consequence analysis?
Q10: When sizing the inlet line and discharge tailpipe for a PSV, which relieving capacity do you take: the Required Process Relief Capacity or the Valve Rated (Certified) Capacity?
Q11: What is the difference in operational impact when the backpressure on a balanced bellows PSV is 30% of set pressure versus 40% of set pressure?
Q12: What are the main types of rupture disks, their burst tolerances per ASME Section VIII, and why are reverse-buckling disks preferred upstream of PSVs?
Q13: How do you build and rate a relief header network in Flarenet? Explain the workflow, topology, and boundary constraints.
Q14: In flare piping systems, what is the role and impact of a PSV discharge expander? How does it affect Mach number, backpressure, and acoustic noise?
Q15: What is the technical and operational rationale behind providing 20 to 30 minutes of liquid hold-up capacity in a Flare Knock-Out (KO) Drum?
Milestone Module 2
2. HAZOP Leadership, LOPA & SIL Verification
Master node boundary definitions, guideword combinations, initiating event frequencies, and PFDavg calculations.
⚡ Rapid-Fire Interview Questions & Model Answers (7)
Click to toggle answer
Q1: What are all the credible scenarios that can overpressurize protected equipment during process design? How do you apply the API 521 single-jeopardy principle?
Q2: How do you calculate the heat input and relief load for PRV sizing under an external pool fire exposure scenario per API 521?
Q3: How do you do BDV sizing? Explain the API 521 15-minute depressuring criterion, restriction orifice sizing, and low-temperature MDMT risk.
Q4: Explain the isolation philosophy in P&ID development. When is Double Block & Bleed (DBB) mandated over Single Block & Bleed (SBB)?
Q5: What is PSD? Explain the different hierarchical levels of process shutdown (Level 0, 1, 2, and 3) in plant safety design.
Q6: How can an EPC engineer justify a piping specification break from 600# to 300# without installing a downstream PSV?
Q7: How do you determine the fail-safe action (Fail Open, Fail Closed, or Fail Locked) for control valves during P&ID development?