Academy / Game Arena / Industrial Simulation / Game 18
💥
GAME 18 Industrial Simulation • Engine B • Numerical & Sizing Engine

Relief System Sizing Race

Size pressure relief valves under fire case and blocked outlet contingencies before vessel rupture.

● LIVE PLAYABLE
Discipline: Chemical & Process Engineering
Difficulty: Advanced (Senior Lead / Plant Operations)
Duration: 8 minutes
Target Audience: Working Engineers & EPC Designers
XP Rewards: +90 Base XP

📖 Mission Overview & Context

Calculate required relief orifice area (API 526 designations D through T), evaluate built-up and superimposed backpressure, and verify inlet pressure loss < 3%.

🎯 Engineering Learning Objectives

✓ API 520 / 526 orifice sizing equations
✓ Fire case wetted surface heat absorption (API 521)
✓ Inlet line loss & chatter prevention

📋 Industry Standards & Governing References

API 520 Part I & II, API 521, API 526

This game incorporates technical tolerances, equation forms, and sizing criteria derived directly from authoritative industrial bodies and API / ASME standards.

⚙️ How to Play & Operational Rules

Determine relieving load, calculate orifice area using API 520 formulas, select API 526 letter designation, and verify piping limits.